Office building for gas pipeline construction contractors - 1st phase ALGECO modular buildings form facilities for the construction company. There are offices, a meeting room and sanitary modules. Due to the location, it was necessary to connect the sanitary facility to a sump. The whole building is connected to Internet. The interiors of the building were equipped with basic office equipment thanks to our 360° SERVICE. The premises will also have a storage facility with security. ALGECO modules form facilities for the security guard. |
|
A modular assembly for the event with 220 thousand people in attendance Residential containers in ALGECO EVENT version were used as the facilities for organizers, partners and guests of the event. Modular assemblies served as office space for the main organizational team, meeting places for VIP zones, the facilities for pilots and television crews. |
|
An office building for the management of the company with facilities Container modules are used as a two-storey building where office spaces for the company management are located. There is an office for the manager with a room for the assistant. On the second floor, there is a sitting room for the rest of the employees. It also includes a kitchenette. |
|
Office building for the production halls of s. n. o. p. cz a.s. under construction The container modules are part of the third production plant of s. n. o. p. cz a.s. The single-storey assembly consists of a total of 11 offices and 5 sanitary containers providing a comfortable office space. This building also houses the dressing rooms for employees. The building is equipped with air conditioning, and the thermal comfort can also be regulated using the outdoor blinds. |
|
Office building for the general contractor of a car battery manufacturing plant ALGECO containers were used for the construction and implementation of a two-storey building for HYUNDAI ENGINEERING CO., LTD. and their partner. This project was created as a makeshift workplace with the possibility of later expansion. In the first phase the building consisted of 75 containers. The investor requested a workplace for a total of 100 people, including the complete supply of furniture and 360° service. |
|
Office building for a pharmaceutical company in Budapest, Hungary. Made in Staré Město The container modules produced in the factory in Staré Město are used as a comprehensive, fully equipped office building. The building has 3 floors, and our modular system has created a floor area of 376.5 m2. The container building provides comfortable facilities for 72 employees. It contains offices, a central archive and a kitchen. The height of the units is 3,200 mm. There was emphasis on increased insulation with 30-minute fire protection (Fermacel plasterboard as the top layer of walls and ceilings). |
|
Our ALGECO Modules at 2019 IIHF Ice Hockey World Championship Slovakia It was our company´s pleasure to deliver modular units to Bratislava and Košice where the 2019 Ice Hockey World Championship took place in May. During the championship our modules provided facilities for broadcast teams and technologies. The comfort was supported by air-conditioners and sanitary containers throughout the championship. All visitors to the championship walked through special modules located in the security zone. |
|
Modular ALGECO building as facilities for the renovation of IKEA in Brno IKEA Czech Republic is currently investing in the renovation of its building in the Avion shopping center in the south of Brno. |
|
Complete facilities for the reconstruction of a railway station in Brno Our modular buildings became a part of an extensive reconstruction of a railway station in Brno. Our cabins were used for a temporary waiting room that can serve up to 110 passengers. It is equipped with high-quality chairs, benches and tables to improve the comfort. A cash desk is an integral part of it. |
|
Our modular buildings used as facilities for a four-year-long project in Prague In 2015, an investment plan for the replacement of four combustion boilers started in Prague. The project was executed in 2018. |